This is an old revision of the document!


Returning Tools To The Warehouse

Remember, you are only returning a tool that has a valid tool number on it… T-0000-LETTER OF THE ALPHABET, tools without this are to be returned as MATERIAL in JC Material Use.

Before physically returning the tool to it's respective warehouse, please inspect the tool and run it if it's possible to determine if it is broken or can be returned as normal. Make sure any parts that come with the tool are all accounted for as well, otherwise it would be “broken” while waiting for parts to be ordered for it. If we happen to have parts to make the complete tool, please take out of inventory in an adjustment and add to the tool to make complete.

Example: Pipe cutter T-0101: consists of pipe cutter, 2-roller stands, hydraulic pump, extra blade for cutter, etc.

  1. Log in to Viewpoint if not all ready
  2. Click the + on “Equipment Management”
  3. Click “Programs”
  4. Click “EM Location Transfers”

* Create a new batch

* In the “Seq” field hit N, or New, or 1 and tab to “Equipment”

* Hit F4 and find the tool that you are returning, there may be a 0 added onto the tool number you have written down

* Select that tool and tab to the “To Location” (you should see what job it's being returned from in the “From Job” field)

* In the “To Location” type WH for Warehouse if it's not a broken tool and MR for Maintenance Warehouse if it's broken **if the tool is in fact broken, make sure to physically put it into the Broken Tools Bay, and tell Kalan**

* Tab to the “In Date” and type in the day that it is being returned with month/day/year

* Uncheck the “Locked” column and hit save at the top of the screen

Enter as many tools as you have returned and click “File,” “Process Batch,” “Validate,” and “Post”

You have now returned all the tools on your list!

If you wish to delete the batch and not post it, instead of clicking “Validate” click “File” and “clear batch,” then exit from EM Location Transfer.